Interface
Interactive assessment and exploration UI
Engineering imagination into impact.
TechM4Solutions · Software division
TechM4Solutions designs and builds software products, applications, AI solutions and digital experiences. What you get is working software in the hands of the people it was made for, from one team that carries it from the first brief through to release and support.
Interface
Interactive assessment and exploration UI
Engine
Interest mapping and recommendation models
Intelligence
Assistants, agents, analytics
Roadmaps
Curated domain, skill and education pathways
Interface, services and data describe modern cloud platform architectures. Intelligence is a TechM4Solutions discipline integrated across the stack.
Explore TechM4SchoolsDelivery sheetTM4S / 03
Starts withA conversation about the brief
Delivery record
Products, apps, websites, AI projects and custom software, designed and delivered for companies, schools and institutions. Client names stay private until a client asks to be named.
We are the software division of TechM4India. We design, build and ship products, apps, AI systems and enterprise software, and we stay for the support after release.
Call us now+91 63018 14246
14+Companies helped with design and development
Delivery figures from TechM4Solutions. Project references are shared on request.
Capabilities
Most projects draw on two or three of these, which is why they sit under one roof and one point of contact.
Capability 01
Systems that help a team see patterns, answer questions and act with more context.

Schematic · agent loop
The TechM4Solutions edge
Long-term solutions built on R&D, not a template.
Automation, intelligence and prediction designed in from the start.
Built for scale, security and reliability from the first component.
Lean engineering processes that keep quality high and overheads low.
From the first idea to the prototype, the release and the growth after it.


Illustrative scenes
The stack, as used
Only technologies named in our own products, roles and repositories. The tools for your project are chosen after the brief, not before it.
This website and digital applications; Android in the FoodSpectra concept
Backend services and data platforms; FastAPI and SQL in AI engineering; TimescaleDB and InfluxDB in device concepts
The AI engineering role, and the model designs for the AcoustiCast, FoodSpectra and ITCMax concepts
The IoT engineering role, and the sensor designs for the AirGuard Pro and AcoustiCast concepts

Selected work
One system that is built and running, two school platforms and four product concepts. Every entry says which it is. Open one to read the problem it addresses and how it works.
Featured platformBuilt
AI-driven career discovery for schools.
A focused assessment and guidance platform helping students identify strengths and map out actionable learning paths.
The problem. School students are asked to choose subjects and streams before they have a clear view of their own strengths and interests.
Built with. Next.js, TypeScript, Tailwind CSS, Python
Running software, built by the team.
Explore TechM4SchoolsKey platform capabilities
Integrated with TechM4Schools innovation programs and partner institutions across India.

School platformSchool innovation platform
The problem. A school running several innovation programmes has no single place to manage them or to see how students are progressing.
How it works. A digital backbone for a school's innovation initiatives: programme management, student profiles, data insights and analytics, event management and collaboration tools.
A TechM4Schools platform. Availability for your school is confirmed on enquiry.
See it on TechM4SchoolsConcept 01Product concept
Industrial IoT
The problem. Compressed air leaks in pneumatic plants are hard to hear and easy to miss, and every undetected leak wastes energy.
How it works. Designed as an ultrasonic leak detector for compressed air lines: a software-defined radio front end listens for leaks, a machine learning classifier identifies them, and results are stored and shown in a web interface.
Proposed stack. RTL-SDR, ESP32, ML leak classifier, TimescaleDB, React
A product concept from the TechM4Solutions portfolio. Specifications are drafted; build status is shared on enquiry.
Ask about this conceptConcept 02Product concept
AI quality control
The problem. In a foundry, shrinkage defects inside a casting are usually found only after the part has been machined.
How it works. Designed to listen to the mould while the metal solidifies: acoustic emission sensors feed a neural network that flags likely solidification defects before machining starts.
Proposed stack. SM-24 geophones, STM32, 1D-CNN, InfluxDB
A product concept from the TechM4Solutions portfolio. Specifications are drafted; build status is shared on enquiry.
Ask about this conceptConcept 03Product concept
Food technology
The problem. Food processors who suspect adulteration normally send a sample to a laboratory and wait for the result.
How it works. Designed as a handheld near-infrared device that screens a food sample for adulteration on site, paired with an Android app.
Proposed stack. AS7265x spectral sensor, PLS-DA, MobileNetV3, Android
A product concept from the TechM4Solutions portfolio. Specifications are drafted; build status is shared on enquiry.
Ask about this conceptConcept 04Product concept
Finance software
The problem. Small businesses lose GST input tax credit when purchase records do not match supplier filings, or when a deadline passes unnoticed.
How it works. Designed to reconcile input tax credit for a business: a classifier flags mismatched entries, and alerts go out on WhatsApp.
Proposed stack. XGBoost, PostgreSQL, React, WhatsApp alerts
A product concept from the TechM4Solutions portfolio. Specifications are drafted; build status is shared on enquiry.
Ask about this conceptDemonstrations and project references are arranged on request.
Industries
Platforms shaped around the rules, the scale and the way work is actually done in each industry.
01 / 09
Industry context / Food production
From cultivation to material preparation, the details on the ground shape what useful agriculture and manufacturing systems need to account for.
Client-supplied reference photography. These are not TechM4India project images.

How we work
Five steps, each ending in something you can hold. Scope and schedule are agreed with you for each project; nothing here is a fixed timeline.
We start with the people, the constraints and the result you need, before any technology is proposed.
You receiveA written brief: the problem, the users, the scope and the open questions.
Flows, screens and system structure are worked out together and reviewed with you until they are agreed.
You receiveInterface designs and a technical plan you can review and challenge.
The software is built in increments, so there is always something working to look at and respond to.
You receiveRegular working builds and a running list of what is done and what is next.
We test, deploy and hand over, with the people who will run the system in the room.
You receiveThe released software and the notes needed to operate it.
After release we stay available for fixes, changes and the next round of work.
You receiveA point of contact and an agreed way to raise changes.

Annex · Pay-and-use computer labs
Our labs feature Silicon Valley-level computer systems that run high-end software with ease. Walk in, work on a machine built for the job, and pay for your usage time, not for the hardware.
High-end machines for work that brings an everyday laptop to a halt: simulation, rendering, CAD and model training.
Demanding professional software runs with ease, so you spend the session working, not waiting.
Come to the lab, use what you need and pay for the time you use it. No hardware to buy, no machine to maintain.


The software you need and roughly how long the job will take.
We confirm a machine and a time that suit you.
Use a high-end system at the lab for your session.
You pay for the hours you used. Nothing more.


System configurations, software availability, location and hourly rates are confirmed when you book.
Book lab timeBook a discovery call
Either is a good place to start. Tell us who it is for and what has to be true when it works.
Projects, products and lab time all start with a short conversation about the people, the constraints and the result you need.
